BLOG
The definitive book on TM is back! See how transportation management fits into your SAP S/4HANA landscape and find out what’s new for basic and advanced TM. Walk through master data to get your transportation network up and running. Then follow step-by-step instructions to set up and use embedded TM functionality in SAP S/4HANA for transportation planning, freight order management, transportation execution, charge management, and more. Round out your implementation with detailed integration scenarios, migration tips, and best practices.
Take the guesswork out of app development with this comprehensive guide. Learn how to use SAP Fiori elements to develop SAP Fiori applications with minimal coding. Walk through the basics of SAP Fiori elements, including the OData standard, programming models, and development tools. Then, follow step-by-step instructions to build your applications using floorplan templates. Finally, learn how to deploy and extend your applications. This is your complete resource for creating and extending SAP Fiori elements apps!
Get MM on SAP S/4HANA! Set up the master data your system needs to run its material management processes. Learn how to define material types, MRP procedures, business partners, and more. Configure your essential processes, from purchasing and MRP runs to inventory management and goods issue and receipt. Discover how to get more out of SAP S/4HANA by using batch management, special procurement types, the Early Warning System, and other built-in tools.
Managing projects across an organization is complex. This book guides you through each twist and turn in the project lifecycle using Project System in SAP S/4HANA. Start by setting up the master data that project management depends on. Then configure and run planning functions for project logistics and financials. Finally, execute your projects and manage all period-end allocation and close tasks. Details on project analysis reports and integration scenarios make this the only guide you need!
See how SAP S/4HANA for advanced ATP improves your fulfillment process! Get aATP up and running in your system, and then explore functionality for each step of order processing, from scheduling to delivery. Find out how SAP Fiori apps simplify your key transactions, discover the BAdIs and APIs available for extending aATP, and apply multiple aATP capabilities across your business. With this comprehensive guide in your hands, it’s easier than ever to meet customers’ demand for your product!
Planning your SAP S/4HANA implementation project? This book has the expert guidance you need for every step of the journey! Learn about SAP Activate, including key concepts, the methodology, and supporting technologies. Understand your workstreams for configuration, data migration, extensibility, and more—then dive into deployment. Walk through the key phases and deliverables for your project, whether you’re performing a new implementation or system conversion, and see what’s possible with a two-tier ERP setup. Get ready for a successful go-live!
The general ledger is the backbone of your financials system. Learn everything you need for configuring and using the general ledger in SAP S/4HANA. Walk step by step through setting up fiscal years, posting periods, parallel ledgers, and more. See routine processes like posting, document control, and year-end closing in action. Whether you’re planning a new implementation or a system conversion, this is your complete guide to general ledger accounting in SAP S/4HANA!
What is SAP Business Technology Platform, and what does it offer your organization? Answer these questions and more with this introduction! See how SAP BTP serves as your complete technical foundation and learn about its capabilities for application development, integration, data management, analytics, and more. Identify business use cases and follow practical examples that show how to use SAP BTP’s portfolio to its full potential. Envision how SAP BTP enhances your business!
Get new insight into your business processes with SAP Signavio! Begin with an overview of the SAP Signavio portfolio, and then dive into each tool. You’ll see how to automate, execute, and collaborate on workflows, mine process data for insights, review best practices, create customer journey models, and more. Next, learn how SAP Signavio integrates with SAP S/4HANA and understand how it can be used to plan and implement SAP S/4HANA projects. Start improving your business workflows today!
Develop cloud applications customized for your business needs! Master the basics of SAP Business Technology Platform (SAP BTP) and its development environments; then get step-by-step instructions for developing and operating your own applications. Build your backend with Java, Node.js, or ABAP, and set up your frontend using SAPUI5 and SAP Fiori. With detailed code examples throughout, this book is your complete guide to building cloud applications on SAP BTP!
To effectively plan production costs, you know that guesswork and projections aren’t enough. Optimize your production processes—and increase profitability—with this guide to production variance analysis in SAP S/4HANA. Start with the planning basics, and then perform costing runs and create cost estimates. See how to post actual costs with the Universal Journal, analyze variance during period-end processing, and assess scrap. Get details on SAP Fiori apps for reporting and the road ahead for variance analysis in this comprehensive resource!
The Material Ledger is mandatory in SAP S/4HANA. Get it up and running smoothly with this all-in-one resource! Configure key settings for currency conversion, ledgers, and valuation views. Then set up and run your key ML processes, step by step: actual costing, group valuation, profit center valuation, parallel cost of goods manufactured, and balance sheet valuation. Walk through special scenarios and execute reports to monitor material value flows. Unlock the potential of the Material Ledger!
Looking for a comprehensive guide to product costing in SAP (SAP CO-PC)? With this best-seller, you’ll begin with a breakdown of how to manage master data and configure settings in SAP CO. Next, you’ll learn the nitty-gritty details of integrated planning, from creating cost estimates to handling planned costs, actual costs, and final settlements. Contains coverage of SAP HANA, current trends in product cost controlling, and other new functionalities!
We cover many SAP terms in the Top Ten SAP Books. Let’s review them:
Just as cost centers can provide planned output services based on activity quantities with Transaction KP26, you can plan cost center activity input quantities from other cost centers with activity input planning using Transaction KP06.
Actual costing determines what portion of the variance is debited to the next-highest level using material consumption. All purchasing and manufacturing difference postings are allocated upward through the BOM to assemblies and finished goods. Variances can be rolled up over multiple production levels and company codes to the finished product.
Actual costs debit a product cost collector or manufacturing order during business transactions, for example, general ledger account postings, inventory goods movements, internal activity allocations, and overhead calculation.
An allocation structure allocates the costs incurred for a sender by cost element or cost element group, and it is used for settlement and assessment. An assignment maps a source cost element group to a settlement general ledger account.
There can be multiple methods of manufacturing an assembly, and many possible bills of materials (BOMs). The alternative BOM allows you to identify one BOM in a BOM group.
While there can only be one cost center standard hierarchy, you can create as many alternative hierarchies as you like. You create an alternative hierarchy by creating cost center groups.
This is a unit of measure defined in addition to the base unit of measure. Examples of alternative units of measure include order unit (purchasing), sales unit, and unit of issue.
An apportionment method distributes the total costs of a joint production process to the primary products. The costs of the individual primary products may vary. They are apportioned by means of an apportionment structure.
An apportionment structure defines how costs are distributed to co-products. The system uses the apportionment structure to create a settlement rule that distributes costs from an order header to the co-products. For each co-product, the system generates a further settlement rule that assigns the costs distributed to the order item to stock.
Assembly scrap is the percentage of assembly quantity that does not meet required quality standards. Assembly scrap is an output scrap because it increases the planned output quantity of items in the production process. You plan assembly scrap in the MRP 1 view using the Net ID checkbox in the Basic Data tab of a BOM item.
Automatic account assignment allows you to set a default cost center per general ledger account per plant.
Backflushing is the automatic posting of a goods issue for components in an order during confirmation. It reduces the amount of work in warehouse management, especially for low-value parts. The material components from the BOM are assigned to operations in the routing.
All component quantities in a BOM relate to the base quantity. You increase the accuracy of component quantities by increasing the base quantity, similar in concept to the price unit.
Base Unit of Measure
Material stocks are managed in the base unit of measure. The system converts all quantities you enter in other units of measure (alternative units of measure) to the base unit of measure.
A bill of material (BOM) is a structured hierarchy of components necessary to build an assembly. BOMs, and purchasing info records allow cost estimates to calculate material costs of assemblies.
A BOM application is a costing variant component for automatic determination of alternative BOMs.
A BOM group is a collection of BOMs for a product or number of similar products.
BOM Item Component Quantity
The quantity of a BOM item that is entered in relation to the base quantity of the product.
Six indicators, such as costing relevancy, are contained in the Status/Long Text tab of a BOM item.
This controls the current processing status of the BOM. For example, a BOM may have a default status of not active when initially created, which then may be changed to active when the BOM is available for use in material requirements planning (MRP) and released for planned orders.
This determines a section of your company, such as production, engineering, or costing. You define which item statuses can be used in each BOM usage; for example, all items in BOMs with a certain usage may be relevant to production.
Bulk materials are not relevant for costing in a cost estimate and are expensed
directly to a cost center. The Bulk Material checkbox is maintained in the MRP 2 view and the BOM item. If a material is always used as a bulk material, set the indicator in the material master. If a material is only used as a bulk material in individual cases, set the indicator in the BOM item, which has a higher priority.
A calculation base is a group of cost elements to which overhead is applied. The calculation base is a component of a costing sheet, which summarizes the rules for allocating overhead.
A chart of accounts is a group of general ledger accounts assigned to each company code. This chart of accounts is the operative chart of accounts used in both financial and cost accounting. All companies within the one controlling area must have the same operative chart of accounts. Other charts of accounts include the country-specific chart of accounts required by individual country legal requirements and the group chart of accounts required by consolidation reporting.
A company code is the smallest organizational unit of financial accounting for
which a complete self-contained chart of accounts can be drawn up for external reporting.
Component scrap is the percentage of component quantity that does not meet required quality standards before being inserted in the production process. The plan quantity of components is increased. Component scrap is an input scrap because it is detected before use in the production process. You can plan component scrap in the MRP 4 view and the Basic Data tab of the BOM item. An entry in the BOM item field takes priority over an entry in the material master MRP 4 view.
Conditions are stipulations agreed upon with vendors, such as prices, discounts, surcharges, freight, duty, and insurance. You maintain purchasing conditions in quotations, purchasing info records, outline agreements, and orders.
The condition technique is used to determine the purchase price by consideration of all the relevant pricing elements. A feature of the technique is the formulation of rules and requirements.
A condition type is a key that identifies a condition. The condition type indicates, for example, whether the system applies a price, a discount, a surcharge, or other pricing, such as freight costs and sales taxes.
A confirmation documents the processing status of orders, operations, and individual capacities. You specify the operation yield, scrap and rework quantity, the activity quantity, work center, and who performed the operation.
Consignment occurs when a vendor maintains a stock of materials at a customer site. The vendor retains ownership of the materials until they are withdrawn from the consignment stores.
A cost center is master data that identifies where the cost occurred. A responsible person assigned to the cost center analyzes and explains cost center variances at period end.
A cost component identifies costs of similar types, such as material, labor, and overhead costs by grouping together cost elements in the cost component structure.
Cost component groups allow you to display cost components in standard reports. In the simplest implementation, you create a cost component group for each cost component and assign each group to a corresponding cost component. You assign cost component groups as columns in cost estimate list reports and costed multilevel BOMs.
The cost component split is the combination of cost components that makes up the total cost of a material. For example, if you need to view three cost components (material, labor, and overhead) for your reporting requirements, the combination of these three cost components represents the cost component split.
You define which cost components make up a cost component split by assigning them to a cost component structure. Within the cost component structure, you assign cost elements and origin groups to cost components.
Each cost component is assigned to a cost component view. When you display a cost estimate, you can choose a cost component view, which filters the cost components displayed in the cost estimate.
Cost elements are included as part of a general ledger account. Primary cost elements identify external costs, while secondary cost elements identify costs allocated within controlling, such as activity allocations from cost centers to manufacturing orders.
A cost estimate calculates the plan cost to manufacture a product or purchase a component. It determines material costs by multiplying BOM quantities by the standard price, labor costs by multiplying operation standard quantities by plan activity price, and overhead by costing sheet configuration.
A costed multilevel BOM is a hierarchical overview of the values of all items of a costed material according to the material’s costed quantity structure (BOM and routing). You display a costed multilevel BOM on the left side of a cost estimate screen. You can also view a costed multilevel BOM separately with Transaction CK86_99.
As of SAP S/4HANA release 2022, event-based processing is available, where goods movements and confirmations represent events that trigger the calculation of overhead according to the costing sheet. Then, depending on the status of the order, this triggers either the posting of a journal entry for the work in process (WIP) or the cancellation of any existing WIP and the calculation of production variances.
A goods issue is the movement (removal) of goods or materials from inventory to manufacturing or to a customer. When goods are issued, it reduces the number of stock in the warehouse.
GR/IR is the SAP process to execute the three-way match- purchase order, Material Receipt, as well as vendor invoice. You use a clearing account to record the offset of the Goods Receipt (GR) and Invoice Receipt (IR) postings. As soon as completely processed, the postings in the cleaning account balance.
An internal order monitors costs and revenue of an organization for short- to-medium-term jobs. You can carry out planning at a cost element and detailed level, and budgeting at an overall level with availability control.
Long-term planning allows you to enter medium- to longer-term production plans, and simulate future production requirements with long-term MRP. You can determine future purchasing requirements for vendor RFQs, update purchasing info records, and transfer planned activity requirements to cost center accounting.
Margin Analysis is the refined version of Account-based COPA. The Universal Journal combines financial and managerial accounting and directly records all dimensions, including custom fields. Margin Analysis provides consistent financial information without any reconciliation needs along with a financial audit trail. All innovations developed for the Universal Journal are immediately available within Margin Analysis. A consistent approach ensures common usage of ledgers, currencies, valuations, predictions, and simulations, as well as their availability in planning and reporting.
Master data is information that stays relatively constant over long periods of time. For example, purchasing info records contain vendor information such as a business name, which usually doesn’t change.
A material master contains all the information required to manage a material. Information is stored in views, and each view corresponds to a department or area of business responsibility. Views conveniently group information together for users in different departments, for example, sales and purchasing.
A process order is a manufacturing order that is used in process industries. A master recipe and materials list are copied from master data to the order. A process order contains operations that are divided into phases. A phase is a self-contained work-step that defines the detail of one part of the production process using a primary resource.
In process manufacturing, only phases are costed not operations. A phase is assigned to a subordinate operation and contains standard values for activities, which are used to determine dates, capacity requirements, and costs.
A procurement alternative represents one of a number of different ways of procuring a material. You can control the level of detail in which the procurement alternatives are represented through the controlling level. Depending on the processing category, there are single-level and multilevel procurement alternatives. For example, a purchase order is single-level procurement, while production is multilevel procurement.
A production order is used for discrete manufacturing. A BOM and routing are copied from master data to the order. A sequence of operations is supplied by the routing, which describes how to carry out work-steps.
An operation can refer to a work center at which it is to be performed. An operation contains planned activities required to carry out the operation. Costs are based on the material components and activity price multiplied by a standard value.
Product drilldown reports allow you to slice and dice data based on characteristics such as product group, material, plant, cost component, and period. Product drilldown reports are based on predefined summarization levels and are relatively simple to setup and run.
Production variance is a type of variance calculation based on the difference between net actual costs debited to the order and target costs based on the preliminary cost estimate and quantity delivered to inventory. You calculate production variance with target cost version 1. Production variances are for information only and are not relevant for settlement.
A production version determines which alternative BOM is used together with which task list/master recipe to produce a material or create a master production schedule. For one material, you can have several production versions for various validity periods and lot-size ranges.
When raw materials are valued at the standard price, a purchase price variance will post during goods receipt if the goods receipt or invoice price is different from the material standard price.
Costing-based profitability analysis enables you to evaluate market segments, which can be classified according to products, customers, orders (or any combination of these), or strategic business units, such as sales organizations or business areas concerning your company’s profit or contribution margin.
SAP Profit Center is a management-oriented organizational unit used for internal controlling purposes. Segmenting a company into profit centers allows us to analyze and delegate responsibility to decentralized units.
A purchasing info record stores all the information relevant to the procurement of a material from a vendor. It contains the Purchase Price field, which the standard cost estimate searches for when determining the purchase price.
Raw materials are always procured externally and then processed. A material master record of this type contains purchasing data but not sales.
A routing is a list of tasks containing standard activity times required to perform operations to build an assembly. Routings, together with planned activity prices, provide cost estimates with the information necessary to calculate labor and activity costs of products.
Sales and operations planning (SOP) allows you to enter a sales plan, convert it to a production plan, and transfer the plan to long-term planning.
S&OP is slowly being replaced by SAP Integrated Business Planning for Supply Chain (SAP IBP), which supports all S&OP features. S&OP is intended as a bridge or interim solution, which allows you a smooth transition from SAP ERP to on-premise SAP S/4HANA and SAP IBP. See SAP Note 2268064 for details.
SAP Fiori is a web-based interface that can be used in place of the SAP GUI. SAP Fiori apps access the Universal Journal directly, taking advantage of additional fields like the work center and operation for improved variance reporting.
Work in process (WIP) and variances are transferred to Financial Accounting, Profit Center Accounting (PCA), and Profitability Analysis (CO-PA) during settlement. Variance categories can also be transferred to value fields in CO-PA.
A settlement profile contains the parameters necessary to create a settlement rule for manufacturing orders and product cost collectors and is contained in the order type.
A settlement rule determines which portions of a sender’s costs are allocated to which receivers. A settlement rule is contained in a manufacturing order or product cost collector header data.
You need setup time to prepare equipment and machinery for the production of assemblies, and that preparation is generally the same regardless of the quantity produced. Setup time spread over a smaller production quantity increases the unit cost.
The process of recording actual costs for cost objects, such as manufacturing orders and product cost collectors in cost object controlling, is called simultaneous costing. Costs typically include goods issues, receipts to and from an order, activity confirmations, and external service costs.
Source cost elements identify costs that debit objects, such as manufacturing orders and product cost collectors.
A source list is a list of available sources of supply for a material, which indicates the periods during which procurement is possible. Usually, a source list is a list of quotations for a material from different vendors.
You can specify a preferred vendor by selecting a fixed source of supply indicator. If you do not select this indicator for any source, a cost estimate will choose the lowest cost source as the cost of the component. You can also indicate which sources are relevant to MRP.
The standard price in the Costing 2 view determines the inventory valuation price when price control is set at standard (S). The standard price is updated when a standard cost estimate is released. You normally value manufactured goods at the standard price.
You supply component parts to an external vendor who manufactures the complete assembly. The vendor has previously supplied a quotation, which is entered in a purchasing info record with a category of subcontracting.
Tracing factors determine the cost portions received by each receiver from senders during periodic allocations, such as assessments and distributions.
The efficiency and speed of the SAP HANA in-memory database allowed the introduction of the Universal Journal single line-item tables ACDOCA (actual) and ACDOCP (plan). The Universal Journal allows all postings from the previous financial and controlling components to be combined in single items. The many benefits include the development of real-time accounting. In this book, we discuss both period-end and event-based processing.
The valuation class in the Costing 2 view determines which general ledger accounts are updated as a result of inventory movement or settlement.
The valuation date determines which material and activity prices are selected when you create a cost estimate. Purchasing info records can contain different vendor-quoted prices for different dates. Different plan activity rates can be entered per fiscal period.
The valuation grouping code allows you to assign the same general ledger account assignments across several plants with Transaction OMWD to minimize your work.
The grouping code can represent one or a group of plants.
You use valuation types in the split valuation process, which enables the same material in a plant to have different valuations based on criteria such as batch. You assign valuation types to each valuation category, which specify the individual characteristics that exist for that valuation category. For example, you can valuate stocks of a material produced in-house separately from stocks of the same material purchased externally from vendors. You then select procurement type as the valuation category and internal and external as the valuation types.
The valuation variant is a costing variant component that allows different search strategies for materials, activity types, subcontracting, and external processing. For example, the search strategy for purchased and raw materials typically searches first for a price from the purchasing info record.
This valuation variant allows a choice of cost estimates to valuate scrap and WIP in a WIP at target scenario. If the structure of a routing is changed after a costing run, WIP can still be valued with the valuation variant for scrap and WIP resulting in a more accurate WIP valuation.
In the context of multiple valuation and transfer prices, you can define the following views:
– Legal valuation view
– Group valuation view
– Profit center valuation view
Operations are carried out at work centers representing; for example, machines, production lines, or employees. Work center master data contains a mandatory cost center field. A work center can only be linked to one cost center, while a cost center can be linked to many work centers.
Work in process (WIP) represents production costs of incomplete assemblies. For balance sheet accounts to accurately reflect company assets at period end, WIP costs are moved temporarily to WIP balance sheet and profit and loss accounts. WIP is canceled during period-end processing following delivery of assemblies to inventory.